01Description

The MC93 is restored after 35 years of theatrical creation, bubbling cultural action, radiancy on the town.
The building image changes with a complete insulation skinning. The public reception was transformed with the introduction to disabled standards of the institution and the redevelopment of the 800-seat EFREMOV. Are also created a studio (50 seats), a second modular room with 280 seats which multiplies the available forms of entertainment. The hall opens to the city, enlarged, with a restaurant and a permanent library.

The scenic activity of the MC93 is reinforced by the appearance of a large rehearsal room, a costume workshop that confirm the vocation of creation of this national stage.


Photos : ©Sergio Grazia

02Sheet

In short

Contractor
Town of Bobigny
Operation
Full mission and diagnosis
Cost
11,20 M€
Shon
9500
Status
Completed
In charge
Vincent Brossy

Partners

Scenographer
Changement à Vue
Global Engineering
SAS Mizrahi
Acoustic
Alternative Consulting
Scenic networks
Astell

03Project log