01Description

Refitting the dome above the auditorium of the Comédie Française (1900 metal frame), rationalizing service equipment and conduits to free up space; bringing in line with building safety regulations. The work (on the place Colette) was logistically complex, particularly since it was necessary to allow the continued use of the facility during the refit. Photos ©Studio Barthelemy

02Sheet

In short

Contractor
Comédie Française
Operation
Completed
Cost
7 M€
Shon
500 m2
Status
Completed
In charge
Stéphane Delaby

Partners

Acoustic
Jean-Paul Lamoureux
Fluids Engineering
MS Consulting